Facility Summary

The St. Columban Wind Facility is located in Huron County approximately 60 km north of London, Ontario. It consists of 15 wind turbines that make up a total of 33 MW of installed capacity.

Location: Approximately 60 km north of London, ON
Resource: Wind
Technologies: 2.3 MW wind turbines
Nameplate Capacity: 33 MW
First Online: 2015
Power Sales: 21-year power purchase agreement with the Independent Electricity System Operator

St. Columban was acquired by BluEarth in August 2017.

  • 15 –  2.3 MW wind turbines with a maximum nameplate capacity of 33 MW of renewable power
  • Located 60 km north of London, Ontario
  • The facility became operational in September 2015

The Project is classified as a Class 4 Wind Facility and received a Renewable Energy Approval (REA) in accordance with Ontario Regulation 359/09 from the Ontario Ministry of the Environment on July 2, 2013. An amendment to the REA was approved on July 11, 2016.